Skip to content

Water news, education and public project records

WaterBrief home
Home
Industry

Wabag Wins 'Mega' Reliance Order for a Jamnagar Desalination Plant Expandable to 302 MLD

The order, worth more than Rs 1,000 crore under Wabag's own classification, covers an SWRO and BWRO plant plus a 3,000 m3/hr remineralisation unit, to be delivered in phases over 25 months.

In brief

VA Tech Wabag told the stock exchanges on 27 October that Reliance Industries has awarded it a desalination plant at Jamnagar with a capacity of 8,400 m3/hr, expandable to 12,600 m3/hr (302 MLD), along with a 3,000 m3/hr remineralisation plant. Wabag classes the order as 'Mega', its band for domestic orders above Rs 1,000 crore, and says it will be executed in phases over 25 months.

VA Tech Wabag has won an order from Reliance Industries Limited to build a large desalination plant and a remineralisation plant at Jamnagar in Gujarat, the company said in a filing to the NSE and BSE dated 27 October 2026. The scope runs from design and engineering through supply, installation, pre-commissioning, commissioning and the performance guarantee test run, the stage where the plant has to prove it delivers the promised output and quality.

302 MLDCapacity the Jamnagar desalination plant can be expanded to (12,600 m3/hr), from an initial 8,400 m3/hr

What is being built

According to the filing, the plant will start with lamella clarifiers, dissolved air flotation filters and an ultrafiltration system, with their own chemical dosing and backwash systems. That pretreatment train feeds seawater reverse osmosis (SWRO) and brackish water reverse osmosis (BWRO) stages, followed by product water storage and brine outfall pumping. A separate 3,000 m3/hr remineralisation plant will use limestone filters, a lime handling system and carbon dioxide storage and dosing to condition the permeate before it is stored and pumped onward.

How big is the order?

Wabag did not publish the contract value. It called the order 'Mega', which on its own published scale means a domestic order worth more than Rs 1,000 crore. The work is to be executed in phases over 25 months. The filing states that the order is from a domestic entity and is not a related-party transaction. S. Natrajan, Wabag's vice president and head of sales and marketing, said the award reflects Reliance's confidence in the company's technology and execution, and strengthens its position in the global desalination market.

25 monthsExecution period for the order, delivered in phases

Smart Water Magazine, which reported the order on 29 October, noted that this is not Wabag's first desalination work for Reliance at Jamnagar. A 2022 filing covered a repeat order for a 53 MLD SWRO plant at the refinery, and in September 2026 Wabag disclosed a separate Reliance order for an effluent treatment plant at the Dhirubhai Ambani Green Energy Giga Complex. For other industrial users on India's west coast, the design choices here, especially the heavy pretreatment ahead of the membranes and the dedicated remineralisation step, are a useful reference for what a large seawater supply actually involves beyond the RO trains themselves.

Why it matters

Jamnagar is one of the largest refining complexes in the world, and it is choosing seawater over freshwater at a time when western India is short of rain. Large industrial desalination at this scale makes pretreatment, brine handling and remineralisation everyday engineering questions for Indian industry, not just for coastal cities.

Found an error? See the Corrections Policy.

Image: Alexey Demidov / Unsplash