Ireland's Environmental Protection Agency reports that 55% of the 505 licensed wastewater plants run by Uisce Eireann did not always meet licence standards in 2025, down from 59% in 2024. About half of the failures were due to poor operation and maintenance, and the rest to deficient infrastructure.

More than half of Ireland's licensed wastewater treatment plants fell short of their licences last year. The Environmental Protection Agency's report, Urban Wastewater Treatment in 2025, found that 55% of the 505 licensed plants run by Uisce Eireann did not always meet licence standards in 2025, down from 59% in 2024, Smart Water Magazine reported on 5 November 2026.

55% of 505Licensed plants that did not always meet their licence standards in 2025, down from 59% in 2024

Failures of operation, not only design

About half of the failures came from poor operation and maintenance, and the rest from deficient treatment infrastructure. Equipment breakdowns and poor operation and maintenance caused more than 600 incidents at plants in 2025. In Midleton, Co. Cork, an ultraviolet disinfection system had many bulbs out of action, and Uisce Eireann did not act or tell the EPA until inspectors found the fault. The EPA prosecuted the utility after faecal coliform limits were repeatedly breached. In Ballybofey-Stranorlar, Co. Donegal, more than 9 million litres of untreated wastewater were released over six days after a breakdown.

Pat Byrne, Director of the EPA's Office of Radiation Protection and Environmental Monitoring, said many failures could and should have been prevented. The EPA carried out 287 enforcement inspections in 2025, and seven of its 35 successful prosecutions against the utility came that year.

Slow progress on priority areas

The EPA has identified 72 priority areas for urgent action, and improvement works have not started at about 60% of them. Of 35 areas where wastewater is the main pressure on local waters, work has not started at 26, and none is scheduled to finish before 2030. Thirteen of 190 large urban areas failed EU standards in 2025, down from 14. On the positive side, towns and villages discharging untreated wastewater daily fell to 11 by mid-2026, from 29 at the start of 2023.

EU pressure

Ireland has been referred back to the EU Court of Justice over eight urban areas, with the European Commission requesting financial sanctions, and the court has yet to rule. The recast Urban Wastewater Treatment Directive must be written into Irish law by July 2027.

Why it matters

Half of these failures came from how plants were run, not how they were built. The same lesson applies to Indian STPs and ETPs: capacity on paper does not guarantee compliance without steady operation, maintenance and monitoring.