The 25-year framework will cover more than 1,000 treatment plants and 26,000 km of sewers, and proposes 19 performance indicators to decide where money goes.
In brief
Ireland's national water utility, Uisce Éireann, has opened the first consultation on a National Wastewater and Drainage Plan with a 2055 horizon, Smart Water Magazine reported on 27 October. The plan sets out how investment decisions will be made across more than 1,000 treatment plants. The consultation runs from 22 October to 17 December 2026, with a draft plan due in 2027.
Uisce Éireann, Ireland's national water utility, has launched the first public consultation on a National Wastewater and Drainage Plan (NWWDP), a 25-year framework running to 2055, Smart Water Magazine reported on 27 October. The plan is not a list of projects. Instead it sets out how wastewater planning and investment decisions will be made across every public system in the country.
The system it covers
According to Uisce Éireann's figures, the network includes more than 1,000 wastewater treatment plants, an estimated 26,000 km of sewers and more than 2,200 pumping stations, and treats about 1.2 billion litres a day. It also produces around 1 million cubic metres of liquid sludge a year, which goes to about 35 satellite dewatering centres and then to around 17 bioresource centres. The utility says it has invested more than €2 billion in urban wastewater infrastructure since 2020.
How decisions would be made
The proposed method starts with a single national assessment of risk, need and opportunity. Every agglomeration would be scored against 19 performance indicators, 14 of them Uisce Éireann's responsibility and five shared with other bodies. Options would then be compared on a Best Value basis that weighs whole-life cost, carbon, legal requirements and wider benefits. The plan would be updated with each five-year capital investment plan. Ireland's 2024 Water Action Plan names 197 at-risk water bodies where urban wastewater is a significant pressure.
Timeline and EU pressure
The first consultation opened on 22 October and closes at midnight on 17 December 2026, with a public webinar on 16 November. A draft plan and environmental reports will follow in 2027 and the final plan in 2028. The recast EU Urban Wastewater Treatment Directive, in force since January 2025, requires integrated wastewater management plans for agglomerations above 100,000 population equivalent by 2033.
Why it matters
Ireland is ranking every sewerage system against common indicators before choosing what to build. Indian cities planning STPs under AMRUT and Namami Gange could use the same risk-based approach.
Sources
Smart Water Magazine: Uisce Éireann consults on Ireland's first national wastewater plan to 2055 (27 October 2026)Read original ↗Uisce Éireann: NWWDP Performance Indicators Fact Sheet (consultation portal, as linked by Smart Water Magazine)↗Found an error? See the Corrections Policy.
Image: David Field / Unsplash
